PROJECTS

Click the project name to view the gallery.

PROJECT NAME: New Waste Truck Wash
OWNER: Miami Dade Public Works & Waste Management
ARCHITECT : Gallardo & Co.
GENERAL CONTRACTOR: Acme Organisation
BUDGET : Approx $2 Million
DETAILS: Structural Steel Washing Machine With Recycling Water System Concrete & Arc Shaped Metal Deck Roof
8,000 Sq. Ft

PROJECT NAME: Complete Renovation Of a 7,000 Sq. Ft. Office building.
Includes, Office Partition, Dry Wall, Ceiling, Plumbing, Electrical, HVAC, Roof Painting, Sewer and Water Lines, Doors, Windows, Tiles & Carpet Flooring
GENERAL CONTRACTOR: Acme Organisation, Inc.
BUDGET : $1.4 Million

PROJECT NAME: South-Dale Landfill Grading Cell #5.
PROJECT DESCRIPTION: Demuck, Haul, Place, Grade and Compact 145,000 cubic yards of fills.
Requires Lifts and Testing.
AMOUNT : $1,000,000.

PROJECT NAME: Ft. Lauderdale/Hollywood International Airport, Florida.
PROJECT DESCRIPTION: Terminals 2,3 & 4-Construction on the Drainage System, Site Work, Water/Sewer Line, Paving and Concrete.
Owner: Broward Country Aviation Dept.
Prime: Skanska USA Building, Inc.
Amount: (Acme Organisation, Inc.):- $1,000,000,00.

PROJECT NAME: Miami Central Senior High School, Miami Florida.
PROJECT DESCRIPTION: Construction Of Drainage, Water and Sewer Systems. Athletic
Fields: Football, Baseball and Track Field.
Owner: Miami Dade Country Public School
AMOUNT : $2,000,000,00.

PROJECT NAME: Holmes Elementary School, Miami Florida.
PROJECT DESCRIPTION: Construction of Basket Ball Court, Children Playing Ground, Drainage, Sewer and Water Systems, Side walk, Parking Lot and Concrete Stair Case.
Owner: Miami Dade Country Public School.
AMOUNT : $1,300,00.00.

PROJECT NAME: Miami International Airport, Miami.
PROJECT DESCRIPTION: Installation of 300 Bathrooms with Accessories for the North Terminal.
Owner: Miami-Dade Country Aviation Dept.
Prime: Parsons/Odebrecht Joint Venture. (POJV).
AMOUNT : (Acme Org, Inc.): $1,699,000.00.

Design Build: Reconfiguration of Parking Lot for Security Purposes. Installation of New Guard House
with Electricity, Water, mTAC, Concrete Work, Security Fence with Remote Control Gate, Asphalt and Landscaping.
Owner: Miami-Dade Country Transit Agency Dept.
Prime: Acme Organization, Inc.
AMOUNT : $124,000.00.

Office Building Renovation: Complete Renovation of a 7,000 Sq. Ft Office Building.
Owner: Miami-Dade Country Solid Waste Management Dept.
Prime: Acme Organization, Inc.
AMOUNT : $1,309,000.00.

PROJECT NAME: Krome Detention Lockdown Dormitory, Contract DACW17-97-c-0054.
CLINT NAME: U. S. Army Corps of Engineers, Jacksonville District.
SERVICES PERFORMED: Site Clearing, Muck Removal, Shot Rock, New Structural Fill & Dike Construction.
CONTRACT AMOUNT : $2,100,000.00
ACTUAL AMOUNT : $2,100,000.00
PROJECT DESCRIPTION: Removal of approximately 7 acres of muck, average 4 feet deep, Area was filled with shot rock and structural up to 10.5 to 11 feet.
Construction of a dike on 3.5 acres of land.

PROJECT NAME: American with Disabilities Act (ADA) Compliance Repair-Country wide sidewalk.
CLINT NAME: Florida Department of Transportation.
SERVICES PERFORMED: Countrywide removal and replacement of existing sidewalk to meet AD A standards.
CONTRACT AMOUNT : $232,000.
ACTUAL AMOUNT : $232,000.

PROJECT NAME: Pump Stations 364,1061,6201012,367,446 and 743.
CLINT NAME: Miami-Dade Water & Sewer / Church and Tower (Dade Country).
SERVICES PERFORMED: Removal of an existing old pumps. Installation of new Pump Stations.
CONTRACT AMOUNT : $1,027,000.00
ACTUAL AMOUNT : $1,129,700.00
PROJECT DESCRIPTION: Removal and Replacement of an existing station the value box, wet well to slab, all pipes, valves and fittings. Removed existing control panel and replace new ones.

PROJECT NAME: W-687 (16" Water Main Line - Highland Lake Blvd).
CLINT NAME: Miami-Dade Water & Sewer Department (Metro-Dade Country).
SERVICES PERFORMED: Installation of 16" Water Line 1.5 miles long.
CONTRACT AMOUNT : $526,000.
ACTUAL AMOUNT : $660,000.
PROJECT DESCRIPTION: Installation of 1.5 miles of 16" dip water line including laterals. 1.5 miles of road repairs, resurfacing including markings.

PROJECT NAME: Home Beautiful Swales.
CLINT NAME: City of Ft. Lauderdale, Florida.
SERVICES PERFORMED: Sidewalk repair, installation of drainage system, road grading and resurfacing and sodding.
CONTRACT AMOUNT : $230,000.00.
ACTUAL AMOUNT : $230,000.00.
PROJECT DESCRIPTION: General Renovation of community area.

PROJECT NAME: American Disabilities Act (ADA) Sidewalk Improvement "A".
CLINT NAME: Miami-Dade Country Public Works Department.
SERVICES PERFORMED: Countrywide removal and replacement of sidewalk including paverment markings to meet "ADA" standards.
CONTRACT AMOUNT : $259,000.
ACTUAL AMOUNT : $270,000.
PROJECT DESCRIPTION: Removal and reconstruction of sidewalk to meet ADA standards.

PROJECT NAME: University of South Florida Science Bldg. Demolition.
CLINT NAME: Florida Board of Regents (Subcontractor to Metric Constructors).
SERVICES PERFORMED: Internal demolition of a five-story building including mechanical units and ground water control.
CONTRACT AMOUNT : $340,000.00.
ACTUAL AMOUNT : $370,000.00.
PROJECT DESCRIPTION: Demolition of a five story building.

PROJECT NAME: Kissimmee River Basin Restoration Project, Contratc 5.
CLINT NAME: U. S. Army Corps of Enginners, Jacksonville District.
SERVICES PERFORMED: Degrade Levee, Build Culverts and Road.
CONTRACT AMOUNT : $1,668,000.00.
ACTUAL AMOUNT : $1,900,000.00.
PROJECT DESCRIPTION: Dredging existing S-65A Tieback Levee, procurement and installation of culvert structures X2 and X3, construction of road and environmental mitigation.

PROJECT NAME: S-5A Basin Diversion Project (West Palm Beach).
CLINT NAME: South Florida Water Management District/ IT Group.
SERVICES PERFORMED: Hillsborough and Ocean Canals widening.
CONTRACT AMOUNT : $1,000,000.00.
ACTUAL AMOUNT : $1500,000.00.
PROJECT DESCRIPTION: widening of two canals, dredging (including bottom rock blasting), demolition of three bridges, grading, environmental restoration, hydro-seeding and engineering services.

PROJECT NAME: South Bay Apartments.
CLINT NAME: West Palm Beach Housing Authority.
SERVICES PERFORMED: Structural, Drainage and General Renovations.
CONTRACT AMOUNT : $200,000.00.
ACTUAL AMOUNT : $250,000.00.
PROJECT DESCRIPTION: Foundation repairs, building leveling, drainage repairs, interior and exterior renovations.

PROJECT NAME: Special Bus Passenger Shelters.
CLINT NAME: Metro-Dade Country Transit Agency.
SERVICES PERFORMED: Design and Installation of Bus Passenger Shelters.
CONTRACT AMOUNT : $370,000.00.
ACTUAL AMOUNT : $390,000.00.
PROJECT DESCRIPTION: Design and build twenty-four shelters for bus passengers at twenty-four bus

PROJECT NAME: Structural Repairs.
LOCATION: Central District Wastewater Treatment Plant, Virginal Key, Miami.FL.
OWNER: Miami-Dade Water and Sewer Dept.
AMOUNT : $529,333.00.
PROJECT DESCRIPTION: Repair of Structural damages to Waste Treatment Bays
STATUS : Completed in November 2016.

PROJECT NAME: Rehabilitation of Underground water Pump.Station.
LOCATION: South Dade Landfill, Miami,FL.
OWNER: Miami-Dade Waste Management. Dept.
AMOUNT : $274,000.00.
PROJECT DESCRIPTION: Complete rehabilitation of underground Pump.Statiom.in.Wet Well. Repair the wet well with fiber glass , Installing new pump in 30 ft deep wet well. Complete installation of new electrical components and control panel.
STATUS : Project in progress.